After days of rain, our Conservation Volunteers were delighted to be back out on the land, clearing gorse from the historic Drake’s Leat. Built at the end of the 16th century, Drake’s Leat is a mostly stone-lined watercourse which was dug by hand to transport water 17 miles from Dartmoor to the growing port and city of Plymouth. The channel is 4ft-5ft across and 3ft deep. Originally, the channel was lined with clay, but during the Victorian era many sections were dressed with granite, to help the leat remain watertight.
Although Drake’s Leat hasn’t been in use for many years, before Burrator Reservoir was built it was the infrastructure that carried vital water from the River Meavy on Dartmoor to the town of Plymouth. During the Second World War, when there were fears that German bombers may target the reservoir to cut off Plymouth’s water supply, the leat was repaired as an emergency backup. Luckily for Plymouth, Burrator Reservoir was not damaged, and there was no need to fall back on the emergency supply of water from the leat.



Winter conservation work at Drakes Leat focuses on clearing gorse and bramble from the sides of the channel, as expanding roots systems are often responsible for loosening the remaining granite dressing and can cause collapse. Our volunteers also cleared the flat path that runs along both sides of the leat, keeping the feature accessible for walkers and visitors. The path is obviously well loved and used, as many dog walkers passed by during the course of the days work.
The work was made a little more challenging by the fact that the leat was filled with water, something that is rarely seen in the modern day. This meant that volunteers were unable to step down into the channel to tackle gorse growing on the banks, but rather had to operate solely from above. Despite this, work continued at a respectable pace, and it was fascinating to have a glimpse into how the leat would have looked when it was in operation and diverting water down from Dartmoor to Plymouth.
Keeping the historic leat clear is an ongoing task which the DPA have been committed to for many years. Clearance work is carried out section by section, with strimmers and hand tools being used to cut back gorse, before the spiky cuttings are raked safely out of the way. On this most recent workday, we were pleased to be joined by a new volunteer with previous experience volunteering with the National Trust. He was warmly welcomed and proved to be an excellent asset, trimming back waist high gorse that was encroaching onto the path.
DPA Conservation Volunteers will be continuing work to clear this fascinating piece of archeology over the coming month, and new volunteers are always welcome. Find details on how to get involved on our website.